Skip to main content

Create & Run Checklist Link

A Create & Run Checklist link creates a new checklist from a template when someone opens it. You can put the link anywhere a link can go — in another checklist, an email or chat message, a wiki page, a document, or another system — so that starting the process takes one click.

The link creates one of two kinds of checklist: a Team checklist, worked inside CheckFlow, or a Shared checklist, worked through a share link. By default only signed-in users of your workspace can use it. Anyone Can Use The Create & Run Link opens it to everybody — see Let Anyone Use the Link.

Before You Start​

  • To generate a link you must be an Administrator, or a Member with Library.Creator and Edit permission on the template's Library folder. The Generate Create & Run Link action is on the template's Actions button in the Library.
  • To change Anyone Can Use The Create & Run Link you must be an Administrator, or a Member with Template.Creator who can run the template under Checklist Permissions.
  • The template must not be archived. Archiving a template stops every link to it working, for everyone.
  1. Open the Library and find the template.
  2. Click the template's Actions button and choose Generate Create & Run Link. The Create & Run Checklist Link dialog opens.
  3. Optionally, enter a name in the Checklist Name box. Type {{ to pick a date and time placeholder, such as {{dddd, MMMM d HH:mm:ss}}, which is filled in when the link is opened. Leave the box empty and the person opening the link is asked for a name.
  4. If you entered a name, tick Ask User to Confirm the Checklist Name to show it to the person opening the link, who can change it before the checklist is created. Leave it unticked and the name is used as given: the person opening the link is asked only for the template's parameters, if it has any — see Use the Link.
  5. Choose the Checklist Type: Team or Shared.
  6. Tick or untick Anyone Can Use The Create & Run Link to change who can use the link. The setting is saved as soon as you change it — see Let Anyone Use the Link.
  7. Click Copy Link To Clipboard. A Link Copied message confirms it.

The link in the Your Create & Run Checklist Link box is rebuilt as you change the name, the confirmation box and the type.

The Create & Run Checklist Link dialog, with the Checklist Name, Checklist Type and Anyone Can Use The Create & Run Link options above the generated link

Anyone Can Use The Create & Run Link is stored against the template, once for each Checklist Type. The box shows the setting for the type selected, so switching between Team and Shared can tick or untick it. A Setting Saved message confirms each change.

The setting is not part of the link. It applies to every link to that template of that type, including links you generated and sent out before, so unticking it closes all of them at once.

Checklist TypeBox untickedBox ticked
TeamOnly signed-in users of your workspace who can run the template can use the link.Users who can run the template create and open the checklist as usual. Anyone else can submit the starting details without seeing the checklist — see Submit Through a Team Link.
SharedOnly signed-in users of your workspace who can run the template can use the link.Anyone can use the link without signing in, and is taken to the shared checklist they created.

A link used by anyone, rather than by a user who can run the template, is restricted:

  • The checklist is created as your workspace's anonymous user, the same user recorded against work done through a share link. A Shared link with the box ticked does this even for someone who is signed in.
  • Member or Group parameters are not shown, so your users and groups are not listed to the public. Those parameters take the default value set on the template.
  • A name is required, and it can be no more than 100 characters.
  • One internet address can create no more than 20 checklists an hour, and 100 a day, this way.
  1. Open the link in a browser.
  2. If the link needs a sign-in and you are not signed in, the login page opens. Sign in and you are returned to the link.
  3. If there is anything to ask, the Create & Run New Checklist dialog opens. Enter or confirm the Checklist Name if it is shown, fill in any parameters, and click Create & Run New Checklist.
  4. The checklist opens: a Team checklist inside CheckFlow, or a Shared checklist on its shared page.

The dialog asks for whatever the link leaves open, whichever Checklist Type it is:

The linkWhat the dialog shows
Gives no nameThe Checklist Name box and the template's parameters
Gives a name and asks to confirm itThe Checklist Name box, filled in, and the template's parameters
Gives a name without asking to confirm itThe template's parameters only. The name is used as given.

The parameters are the ones you are shown: someone using a link opened to anyone is not shown Member or Group parameters, which keep the template's default value.

When there is nothing to ask — the link gives the name without asking to confirm it, and there are no parameters to show — what happens depends on whether you are signed in:

  • If you are signed in, there is no dialog. The checklist is created and opened at once.
  • If you are not signed in, the dialog still opens, with only the Create & Run New Checklist button, and nothing is created until you click it. This stops an email scanner or a link preview that opens the link from creating a checklist each time.

Clicking Cancel in the dialog creates nothing.

A Team link with Anyone Can Use The Create & Run Link ticked lets people who cannot run the template submit a new checklist: someone who is not signed in, someone signed in to another workspace, a Guest, or a Member without permission to run the template.

  1. Open the link. A form opens, titled with the template's name.
  2. Fill in the Name, if the form asks for one, and any parameters.
  3. Click Submit. A Thank You page confirms that the details have been submitted.

The form cannot be closed without submitting. It asks for the same things as the dialog in Use the Link, and the same rule applies when there is nothing to ask:

  • If you are not signed in, the form still opens, and nothing is submitted until you click Submit, so a link opened by an email scanner or a link preview creates nothing.
  • If you are signed in — as a Guest, as a Member without permission to run the template, or to another workspace — there is no form. The details are submitted as soon as the link opens, and the Thank You page appears.

Submit Another on the Thank You page opens the same link again.

What Happens Next​

  • Team link. The checklist opens for you, and everybody else on the team is notified that you created it.
  • Shared link. The checklist opens on its shared page, with a share link like any other shared checklist. Administrators and the checklist's assignees are notified.
  • Submission. A Team checklist is created and your team works it as usual. Everybody on the team is notified that a checklist has been submitted through the template's Create & Run link. The person who submitted it gets no link to it and cannot open it.

Every new checklist, however it was created, is sent to the webhooks subscribed to new checklists.

warning

A task assigned to Checklist Creator goes to the user who created the checklist. On a checklist created by a link used by anyone, that is your workspace's anonymous user, not the person who opened the link and not anybody on your team. Assign such tasks to a user or group in the template if your team must act on them.

If It Does Not Work​

What you seeWhyWhat to do
An Unable to Create Checklist pageThe template has been archived, or you cannot run it under Checklist PermissionsRestore the template, or ask an Administrator for Run and View or Run and View Assigned To. See Checklist Permissions.
An Unable to Create Checklist page, and you belong to the template's workspaceYou are signed in to a different workspaceSwitch to the template's workspace and open the link again.
The login page opensAnyone Can Use The Create & Run Link is not ticked for this type of linkSign in, or ask someone who can change the setting to tick it.
Guest Access DeniedGuests cannot create a checklist through a link that needs a sign-inOn a Team link, ticking Anyone Can Use The Create & Run Link lets a Guest submit through it instead.
Please Try Again LaterToo many checklists have been created from your internet address in a short timeWait and try again later.
Name RequiredThe name is empty or longer than 100 charactersEnter a name of 100 characters or fewer.
Anyone Can Use The Create & Run Link unticks itself with an errorYou do not hold Template.Creator, or you cannot run the templateAsk an Administrator to change it, or to grant you the permission. See User Permissions.
The box is ticked for Shared but not for Team, or the other way roundThe two types have separate settingsSelect the type you want and tick the box for it.