Skip to main content

CheckFlow Documentation

CheckFlow turns the processes your team repeats into checklists that can be assigned, tracked, automated and reported on.

You write a template once — the tasks, the content, the rules — and run a checklist from it every time the process needs doing. New here? Core Concepts explains the model in five minutes; Getting Started walks you through building one.

Start Where You Are​

I need to work through a checklist someone gave me​

I am building the process​

I administer the team​

I am integrating CheckFlow with something else​

  • API Reference

    The v3 REST API: authentication, conventions and every endpoint.

  • MCP Server

    Connecting an AI assistant such as Claude to your workspace.

  • Web Hooks

    Being told when something happens, rather than polling.

  • Zapier

    Connecting to other services without writing code.

  • Slack Notifications

    Assignments, mentions and overdue tasks in Slack.

I am evaluating CheckFlow​

Most-Read Pages​

If you read nothing else:

Finding Things​

Use the search box at the top of any page — it searches the full text of every page, not just titles. The sidebar is grouped by what you are trying to do: Get Started, Build, Run, Analyse, Administer, Develop and Help.

Every page ends with Related Pages, a short list of where to go next, chosen by hand rather than generated.