Skip to main content

Library Overview

The Library is the central repository for your team's templates, articles, and files. It gives your team a single, structured place to find and access content, with folder-based organisation and granular permission controls so you can manage exactly who can see and edit what.

Accessing the Library​

Click Library in the top bar to open the Library at its first folder.

To go straight to a folder, click the arrow beside Library instead. On a wide window with a mouse, the menu also opens when you rest the pointer on it. It lists:

  • Unfiled
  • the top-level folders you can open
  • Archived, for Administrators
  • Example Templates

Administrators have full access. Members need a Library permission. Guests cannot access the Library at all.

See Library Roles and Permissions for which permission grants what, and how folder permissions combine with it.

The Library Interface​

The Library is split into two panels. On a window narrower than 1200 pixels, the sidebar folds away behind a Folders & Search button above the item list; click it to open the sidebar.

The left-hand sidebar has its own search, folders, tags and Create New sections. It is separate from the top bar's Library menu. The sections are:

Search — Type into the search bar to find items by name across all folders you have access to. Click the Search button or press Enter to run the search. Click the × to clear the search and return to the folder view.

Folders — The folder tree lists all folders your account has access to. Folders are grouped into two sections:

  • SYSTEM - Built-in folders that cannot be edited or deleted. Includes:
    • Unfiled - items not assigned to any folder
    • Archived - archived templates, visible to Administrators only
    • Example Templates - public library of pre-built process templates
  • TEAM — Folders created by your team. Folders can be nested to create a hierarchy. Click any folder to show its contents in the item list.

Tags — If any library items have tags assigned, the tags are listed here. Click a tag to filter the item list to show only items with that tag.

Item List​

The right-hand panel displays the items in the currently selected folder, search results, or tag filter. Each item shows:

  • Type badge — Identifies whether the item is a Template, Article, File, or Data Set
  • Item name
  • Metadata — Depends on item type; may include the number of checklist runs, last modified date, or upload date
  • Tags assigned to the item
  • Expand arrow — Click to expand the item and view more details such as checklist runs, an article preview, file details, or analytics
  • Buttons for the item, such as Edit Template, Create Checklist, Print Template, Download File and Actions. The buttons are icons; rest the mouse on one to see what it does. On a phone they have a row of their own and show a short word beside each icon.

Item Types​

The Library supports four types of items:

TypeDescription
TemplateA process template your team can use to start checklists. Includes full analytics, checklist run history, and version history.
ArticleA written article — documentation, guides, or reference material. See Articles in the Library.
FileAn uploaded file such as a PDF, spreadsheet, image, or any other file type.
Data SetA table of reference data — clients, sites, products — that can populate Dropdown, Multi-Choice, Sub-Tasks and Table controls in your templates. See Data Sets.

Creating Items​

The Create New section at the bottom of the sidebar has a tile for each type of item. The tiles that are available depend on your permissions:

  • Folder — Requires Administrator or Library.Creator
  • Template — Requires Administrator or Template.Creator
  • Article — Requires Administrator or Article.Creator
  • File — Requires Administrator or Library.FileUploader
  • Data Set — Requires Administrator or Library.Creator
  • Task — Requires Administrator or Task.Creator. Creates a standalone task, which is not filed in the Library.

Example Templates​

The Example Templates link in the sidebar, and in the top bar's Library menu, opens CheckFlow's public library of pre-built process templates that any team can browse and import. See Example Templates for more information.