Tasks Grid Views
A view saves the templates or tasks, assignees, statuses, search text and sort order currently set on the Tasks grid under a name, so you can return to that combination in one click. You can keep a view to yourself, give it to particular people, or publish it to the whole team.
CheckFlow supplies five views to start from, and you add your own alongside them.
Before You Start
- Anyone with access to the Tasks grid — Administrators and Members — can create a Private view.
- To share a view with Users & Groups or with the Entire Team you must be an Administrator, or a Member with the Tasks.View.Creator permission.
- Guests have no access to the Tasks grid and no views.
System Views
These five are built in. They cannot be edited, renamed or deleted, and everyone has them.
| View | Assignees it holds | Statuses it holds |
|---|---|---|
| All Open Tasks | Everyone, including unassigned tasks | Incomplete, Due In Future, Due Today, Overdue |
| All Due Tasks | Everyone, including unassigned tasks | Due In Future, Due Today, Overdue |
| My Open Tasks | You | Incomplete, Due In Future, Due Today, Overdue |
| My Due Tasks | You | Due In Future, Due Today, Overdue |
| Snoozed Tasks | Everyone, including unassigned tasks | Snoozed |
All five filter by template rather than by task, include every template plus standalone tasks, and sort by Due, soonest first, with any undated tasks held at the bottom. My Open Tasks is what loads when you have not set a default.
A view lists only the statuses it holds. All Open Tasks takes all four open statuses, so it includes tasks with no due date at all; All Due Tasks leaves Incomplete out, so it lists only the tasks that have one. Snoozed Tasks holds Snoozed on its own, so it lists the tasks you have snoozed and nothing else.
Save the Current Settings as a View
- Set the Templates filter — on its Templates tab or its Tasks tab — and the Assignees and Statuses filters, and sort by the column you want the view to open on.
- Click Save above the grid. The Create New View dialog opens.
- Type a name in the View Name box.
- Choose Create New View to save a new one, or Update Existing View to overwrite the view currently loaded.
- Choose the Visibility — Private, Users & Groups or Entire Team.
- If you chose Users & Groups, pick the people and groups in the Users & Groups With Visibility box.
- Click Save.
The view appears under Custom Views in the views dropdown at the top left, and the grid switches to it. Its address becomes /Work/{view key}, so you can bookmark it or send the link to anyone who can see the view.
The Users & Groups and Entire Team options are greyed out if you do not hold Tasks.View.Creator. Private is always available.
What a View Remembers
| Setting | Remembered as |
|---|---|
| Templates filter | Which tab was open — Templates or Tasks — and what is ticked on each. Only the open tab is applied when the view loads; the other comes back as you left it. |
| Show Standalone Tasks | On or off. It is one setting shared by both tabs. |
| Assignees and Statuses filters | What is ticked on each. |
| Search text | Whatever was in the Search box, applied again when the view loads. |
| Sort | The column and direction. |
| Column order | Not remembered. See The Tasks Grid. |
A view that has every template, or every task, ticked means all of them rather than the ones that happened to exist when it was saved. Templates added and tasks added to templates later are included the next time the view loads. A view saved with particular tasks ticked keeps exactly those, and a ticked task that later disappears from the list — its template archived, or no longer yours to run — is simply no longer applied.
Switch Between Views
Click the views dropdown at the top left of the grid. System Views are listed first, then your Custom Views in alphabetical order, each with an icon showing who can see it:
| Icon | Visibility |
|---|---|
| Person | Private — you only |
| People | Users & Groups — the people and groups you chose |
| Globe | Entire Team — everyone |
Selecting a view reloads the grid with its settings, and the browser tab takes the view's name.
Set a Default View
Your default loads every time you open the Tasks screen, including when you click Tasks in the navigation.
- Open the views dropdown.
- Hover over the view you want and click the bookmark icon.
The default is yours alone and does not affect anyone else. Without one, My Open Tasks loads.
Edit a View
- Open the views dropdown.
- Hover over the view and click the pencil icon. The grid loads that view.
- Change the filters and sort order.
- Click Save, choose Update Existing View, and click Save in the dialog.
You can edit a view if you created it, or if you are an Administrator. Editing keeps the view's original creator, so a view an Administrator tidies up still belongs to the person who made it.
Delete a View
- Open the views dropdown.
- Hover over the view and click the trash icon.
- Read the confirmation, then click Delete View.
The dialog warns you first when the view is shared — one message for a view visible to particular users and groups, another for one visible to the entire team — because deleting it takes the view away from everyone who has it.
You can delete a view if you created it, or if you are an Administrator. Anyone whose default was the deleted view falls back to My Open Tasks.
If It Does Not Work
| What you see | Why | What to do |
|---|---|---|
| Users & Groups and Entire Team are greyed out | You do not hold Tasks.View.Creator | Ask an Administrator to grant it. See User Permissions. |
| No pencil or trash icon on a view | Somebody else created it and you are not an Administrator | Ask its creator or an Administrator to change it. |
| You are not authorized to share a view with other users | The permission was removed after the dialog opened | Reload the page and save the view as Private. |
| The grid opens on the wrong view | Your default is set to another view | Set the default again from the views dropdown. |
Related Pages
- The Tasks Grid — the filters and sort order a view remembers, including the Templates and Tasks tabs.
- User Permissions — Tasks.View.Creator controls sharing, not creating.
- Custom Report Views — the same pattern applied to whole checklists.
- Group Management — creating the groups you share a view with.