Skip to main content

Get Started Checklist and Tips

A new workspace helps you set it up. The Get started checklist lists the steps that make the workspace useful and ticks each one off as you do it. A welcome question picks example templates for what you want to run. Pages that are still empty say what will appear there and offer the first thing to do, and small tips point out the parts of a page that do the most.

None of it is required. You can hide the checklist, skip the question and put the tips away, and bring them back at any time from the Help menu, the question-mark icon in the top bar.

Why Use the Get Started Checklist?​

Without it, a new workspace is a set of empty pages, and it is up to you to work out which to fill in first.

With it:

  • The steps that make a workspace useful are listed in order, each linking to the place it is done.
  • A step is ticked when you have actually done it, whether in the web app, the mobile app or through the API.
  • Empty pages explain themselves and offer the next step, instead of a blank grid.

Key Concepts​

ConceptDescription
Get started checklistThe list of set-up steps, in a panel opened from the top bar or the Help menu. Each person has their own, with the steps their role and permissions allow.
Progress ringThe Get started pill in the top bar of a new workspace, with a ring and a count of steps done, such as 2/6.
Welcome questionTwo questions asked once of the person who created the workspace: what they want to run first, and how many people will use CheckFlow.
First-run panelWhat the Checklists grid shows instead of an empty grid until the workspace has run its first checklist.
TipA small pulsing dot beside part of a page. Click it to read a short note, then Got it to put it away. Tips replace the guided tours CheckFlow used to have.

How It Fits Together​

  1. Sign up — with your email address, Google or Microsoft. See Getting Started.
  2. Answer the welcome question, or skip it — see The Welcome Question.
  3. Make your first template from the Checklists grid's first-run panel — see The Checklists Grid.
  4. Run your first checklist, which CheckFlow offers as soon as the template is saved — see Run Your First Checklist.
  5. Work through the rest of the Get started checklist — complete a task, invite a teammate and schedule a checklist. See The Steps.

The Get Started Checklist​

The Steps​

Which steps you see depends on your role and permissions. A step you could not do is left out rather than shown.

StepWho sees itTicked when
Create your workspaceAdministratorAlready ticked: you did it by signing up.
Create your first templateAdministrator, or Member with Template.CreatorYou create a template, in any way.
Run a checklistAdministrator, or Member with Checklist.CreatorYou start a checklist.
Complete a task (Complete your first task for a Member)Administrator and MemberYou complete a task in a checklist. Completing a standalone task does not count.
Invite a teammateAdministratorYou send an invitation.
Schedule a recurring checklistAdministrator, or Member with Schedule.CreatorYou create a schedule.

Each step counts what you have done, not what the workspace has: a template a colleague made does not tick your Create your first template. A step can take up to five minutes to be ticked after you do it. Guests have no Get started checklist.

Click a step to go to where it is done. Create your first template opens the Create a template dialog, Run a checklist opens the Create & Run New Checklist dialog, Complete a task opens the Tasks grid, Invite a teammate opens the Users tab of Team Management, and Schedule a recurring checklist opens a new schedule. Once a step is ticked, its explanation is hidden.

In the Top Bar​

In a workspace whose free trial started in the last 30 days, the top bar shows a Get started pill with a progress ring and the number of steps done, such as Get started 2/6. Click it to open the panel. The pill stays until every step is ticked or you hide the checklist.

In an older workspace there is no pill, but the checklist is still in the Help menu.

The panel closes when you press Esc, click outside it, click its close button or click a step.

Hide the Checklist​

  1. Click the Get started pill in the top bar.
  2. Click Hide this checklist at the bottom of the panel.

The pill disappears, for you only, and a message says you can open the checklist again from the Help menu. Your progress is kept.

Open It Again​

Click the Help menu and choose Get started checklist. The panel opens in any workspace, whether you hid the checklist or finished it. When every step is ticked it says All done. Your workspace is set up.

The Welcome Question​

When you create a workspace and arrive with no template yet, CheckFlow asks two questions on a Welcome to CheckFlow screen:

  • What would you like to run in CheckFlow first? — Employee onboarding, Client onboarding, Inspections and maintenance, Audits and compliance, Approvals and requests, IT and change management or Projects and client work. For anything else, describe it in Something else? Describe it in a few words.
  • How many people will use it? — Just me, 2 to 10, 11 to 50 or More than 50.

Neither is required. Click Continue, or Skip for now to go straight on. Either way you arrive at the Checklists grid, and the question is not asked again.

Only the person who created the workspace is asked, and only before the workspace has a template. If you signed up with a template from the CheckFlow website, you arrive at that template and are not asked.

Your answer changes the Checklists grid's first-run panel:

  • Suggested for your choice lists up to three example templates from the matching categories of the template Library, each with Preview and use it, and a link to see more examples from the same category.
  • The Describe it to AI card starts with a description of that kind of process filled in, ready for you to edit. If you described something else in your own words, the card starts from those words instead, the first time.

First-Run Screens​

The Checklists Grid​

Until the workspace has run its first checklist, the Checklists grid shows a first-run panel in place of the empty grid and its filters:

The workspace hasYou see
No templates, and you can create templatesRun your first checklist, with any examples suggested by the welcome question, then the three ways to make a template: Describe it to AI, Start from an example and Build it yourself. These are the same cards as the Create a template dialog. Describe it to AI is shown only if you can use AI features.
No templates, and you cannot create templatesNo checklists yet, explaining that checklists start from templates and that you can start them here once an Administrator adds one you can use.
Templates, but no checklistsNo checklists yet, with Start a checklist if you can create checklists, and Create another template if you can create templates.

Other Pages​

PageWhenWhat it shows
Tasks gridThe workspace has not run a checklist yetNo tasks yet, explaining what the grid lists, with Start a checklist if you can create checklists and Create a task if you can create standalone tasks.
AnalyticsThe workspace has not run a checklist yetNo analytics yet, explaining what Analytics shows once checklists run, with Start a checklist if you can create checklists.
SchedulesThere are no schedulesNo schedules yet, explaining what a schedule does, with Create a schedule if you can create schedules.
A Library folderThe folder is emptyThis folder is empty, explaining what folders are for, with New template if you can edit the folder and create templates. The new template is filed in that folder.

Run Your First Checklist​

When you save a new template in a workspace that has not run a checklist yet, CheckFlow offers to run it:

  • In the Template Designer, a message says Your first template is ready, with a Run your first checklist button. It stays until you close it.
  • After building a template with AI, Run your first checklist is the main button in the summary dialog, beside Keep Editing.

Run your first checklist opens the page that starts a checklist from that template. The offer appears only if you can create checklists.

Tips​

A tip is a small pulsing dot beside part of a page. Click it to read a short note about that part, and click Got it to put it away for good. Tips never cover the page or move the focus, so you can keep working with one showing.

PageTips
Template DesignerAdding tasks, the controls toolbar, a selected task's conditional logic, and the Build with AI menu. The conditional logic tip appears once you select a task. No tips are shown while you build a template with AI or view a template read-only.
ChecklistThe task list, the progress bar, and the checklist menu, including the QR code that opens the checklist in the mobile app.
Checklists gridOnce the workspace has run a checklist: the Schedules link, for people who can create schedules.

Who Sees Tips​

Administrators and Members see tips by themselves in a workspace whose free trial started in the last 30 days. Guests never see them.

To see every tip again, in any workspace, choose Show tips again from the Help menu. The page reloads and the tips start again.

Tips you have put away are remembered by your browser, not your account. Another browser or device shows them again, and so does a private window.

What's New​

To see the latest changes to CheckFlow, choose What's new from the Help menu. CheckFlow's changelog opens over the page, at the most recent releases. Feedback & Updates, beside it, opens the same window at its home page.

Who Can Do What​

ActionRequired role or permission
See the Get started checklist and tipsAdministrator or Member. Guests do not.
Answer the welcome questionThe Administrator who created the workspace
Each step of the checklistThe permission in The Steps

Limits​

LimitValue
Days after the trial starts that the progress ring and tips show by themselves30
Examples suggested by the welcome question3
Length of a Something else? description300 characters