Skip to main content

Rate Limits

The v3 API limits how many requests each workspace can make in a window of time. The limit protects your workspace and everyone else's from a runaway loop; an integration that behaves normally rarely meets it.

Budgets​

Every workspace has two budgets, counted separately:

BudgetDefault limitWhat it covers
standard1,000 requests per hourEvery request that reads or writes workspace data — which is almost all of them.
cheap10,000 requests per hourRequests that cost almost nothing to answer, listed below.

The limits apply to the workspace, not to the key: all of a workspace's keys, and its MCP connections, share the same two budgets.

Windows are fixed, not sliding. Each hour-long window starts on the hour, UTC, and a new window starts with a full budget.

What Uses the Cheap Budget​

SurfaceRequests
RESTGET /v3/auth/test; polling a draft commit with GET /v3/drafts/{key}/commit; the schema and authoring guide routes under /v3/schema/; and validating a template document with POST /v3/templates/validate or a draft with POST /v3/drafts/{key}/validate.
MCPThe protocol itself — initialize, ping, tools/list, resources/list, resources/read, prompts/list and notifications; and the tools get_authoring_guide, get_template_schema, list_content_types, describe_content_type, list_condition_operators, list_due_date_scenarios, validate_template, validate_template_draft and get_commit_status.

Everything else is charged to the standard budget. An MCP request that batches several messages is one request, charged to cheap only if every message in it is cheap.

Rate Limit Headers​

Every response to an authenticated request carries four headers describing the budget it was charged to:

HeaderDescription
X-RateLimit-BucketWhich budget this request was charged to: standard or cheap.
X-RateLimit-LimitThe size of that budget for the window.
X-RateLimit-RemainingHow many requests are left in that budget for the window.
X-RateLimit-ResetWhen the window ends and the budget refills, as Unix time in seconds.
X-RateLimit-Bucket: standard
X-RateLimit-Limit: 1000
X-RateLimit-Remaining: 873
X-RateLimit-Reset: 1790503200

Read X-RateLimit-Bucket alongside the other three. The two budgets have different sizes, so without it two consecutive responses can appear to disagree about your limit.

When You Exceed a Budget​

The request is refused with 429 Too Many Requests, a Retry-After header giving the seconds until the window ends, and the error code RATE_LIMIT_EXCEEDED:

HTTP/1.1 429 Too Many Requests
Retry-After: 1260
X-RateLimit-Bucket: standard
X-RateLimit-Limit: 1000
X-RateLimit-Remaining: 0
X-RateLimit-Reset: 1790503200
{
"error": {
"code": "RATE_LIMIT_EXCEEDED",
"message": "Rate limit exceeded. The standard budget is 1000 requests per window and this workspace has spent it. Retry in 1260 seconds.",
"requestId": "req_2e9d4a7c1b3f48e0a6c5d8b1f7e2a094",
"retryAfterSeconds": 1260
}
}

Every request before the window ends is refused in the same way, so retrying in a loop does not help — wait for Retry-After. Running out of one budget does not affect the other: when standard is spent, cheap requests still succeed.

The MCP server returns the same refusal inside its MCP response, with retryAfterSeconds in the error, and also sends the four headers. See How the MCP Server Works.

Invalid Keys​

Separately from the workspace budgets, requests with an invalid, revoked or expired key are throttled by source address: after 20 such refusals from one address within a minute, further requests from that address are answered 429 until the minute is up. This stops a misconfigured integration from retrying a bad key indefinitely.

Staying Within the Limits​

  • Use pageSize=100 when reading whole lists. It is one request per hundred items instead of two.
  • Use webhooks instead of polling. A webhook tells you when something changes; polling asks every few minutes whether anything has.
  • Batch writes where the API allows it — setting several task fields in one request, or creating Data Set records in bulk.
  • Watch X-RateLimit-Remaining and slow down as it approaches zero, rather than waiting for a 429.
  • Back off on 429 by waiting Retry-After seconds before the next request.
  • Errors — the error body and the other codes.
  • Idempotency — replays count against the budget too.
  • Webhooks — the alternative to polling.
  • Pagination — fewer, larger pages.